Free YouTube Transcribe

Video transcript

Método Paso a Paso: Electroneumática

Jose Luis Sarmiento · 5,434 words · 25 min read

WhatsAppTelegramX

Want to search this transcript, jump the video from any line, or download it as TXT, SRT, or VTT?

Open in the transcript tool

Full transcript

0:01Welcome to this video where we will study the step-by-step method applied to the construction of motion sequences in electro-pneumatic circuits . The step-by-step method applied to electro-pneumatics has certain design requirements . The first requirement is to use two-position directional valves ,

0:23and the second is that both positions must be activated by solenoids , which is why these valve types are common . Here we have a three-way , two-position directional valve , and we can see that both positions are activated by solenoids . This 3/2 valve would

0:47typically be used to control a single-acting cylinder . Here we have a five-way , two-position directional valve . And we can also see that both positions are activated by solenoids . This valve would typically be used to

1:07move a double-acting cylinder . From these two requirements , we can say that in summary , bistable solenoid valves must be used in the step-by-step method . If you want to delve deeper into what monostable and bistable valves are , I

1:27remind you that this topic was already covered here on the channel , and I’ll leave the link to that video in the description below or in a card here . Next , we will continue with the steps required to obtain a motion sequence using the step-by-step method . The

1:51first step is to write down the motion sequence . The second step is to separate simultaneous movements into steps . If there are no simultaneous movements , then there would be one step for each movement . The third step is to

2:15write the condition that must be met to perform that step below the motion sequence . Conditions are usually expressed in terms of pushbuttons or limit switches . The fourth step is to write the element that must be

2:36activated to trigger that step above the motion sequence . Usually , these activation elements are solenoids and relays . Here we must keep in mind that in the step-by-step method , one relay is used for each step of the sequence .

2:59The fifth and final step is to install the general structure for each step of the motion sequence and assign names to the elements . What is this general structure ? The general structure is what we have in this figure . This must be installed for each step of the

3:19motion sequence . On the left side , we have the 24V power supply , and on the right side , we have the circuit ground or the 0V line . This general structure , as we can see here , is composed of a normally open contact in series with

3:41another normally open contact , and those two contacts are in parallel with a normally open contact of a relay . If we continue here , after the parallel connection , we would have a normally closed relay contact in series , followed by a relay coil . Finally , on

4:06this third line , we have a normally open relay contact and the solenoid of the directional valve . This relay coil corresponds to the relay that is activated in the current step . That is to say , in the step to which this general structure belongs . And these

4:29two normally open contacts would belong to the current step's relay ; meaning these two normally open contacts would be associated with this coil . Here we have the current step's solenoid , that is , the solenoid in charge of generating the movement we have in that

4:50step of the sequence . Here we find a normally open contact . This normally open contact depends on the step . If it is the first step , it would be a normally open contact of the push button that starts the sequence . But if

5:10it is a step other than the first , then it would be a normally open contact of the previous step's relay . Here we find another normally open contact , which would be the condition that allows me to generate the next step of the sequence and , therefore , would

5:31correspond to the limit switch that tells me the previous movement has finished . And finally , we have this normally closed contact , which would be from the next step's relay . What would be the function of each of these elements that we find in the general

5:51structure ? We have these two normally open contacts in charge of performing a preparation phase , that is , ensuring that the conditions to generate the movement have been met . We can see that if these two contacts close , the energy

6:12would continue along this line , pass through this normally closed contact , and reach the relay coil , energizing it . When this coil is energized , since it has that relay associated with these two normally open contacts , these two contacts would close . The function of

6:35this contact is to hold , that is , to keep the coil energized even though these conditions are no longer met . Then , the function of this second normally open contact associated with this relay is to perform the work phase , since when the relay coil is

6:57energized , this contact closes , allowing energy to reach the valve solenoid . With this , we activate the solenoid , and the switching of the valve position can be performed , which allows me to generate the movement associated with that step of the sequence . Finally , we have this

7:20normally closed contact which functions to cut the power to perform the next step , since this contact would be associated with the next relay . So , when the next relay is energized , this contact that was normally closed opens , interrupting the power to this relay

7:40and causing these two contacts to become de-energized , thereby cutting the power that was reaching the solenoid of the current step . To better understand all of this , we are going to do an example in which we will apply the step-by-step methodology to build a motion sequence . In this example , we

8:02want to perform the motion sequence A + , A - , B + , B - by pressing a start button in this pneumatic circuit . This pneumatic circuit is composed of two double-acting cylinders , each one controlled by a five-way , two-position directional valve . And we can see that

8:22both directional valves receive pressurized air from the same source . This would be cylinder A. We can see that the cylinder has two limit switches , one at the start of its movement , which would be limit switch FCA1 , and one at the end of its movement , meaning when it is fully

8:44extended . And this limit switch would be called FCA2 . Cylinder B also has two limit switches . FCB1 at the start of the movement and FCB2 at the end of its travel . Regarding the directional valves , for the valve that controls

9:05cylinder A , we have solenoid S1 for the left position and solenoid S2 for the right position . And in the case of the valve that controls cylinder B , we have solenoid S3 for the left position and solenoid S4 for the right position . Next , we are going to apply all the

9:25steps of the step-by-step methodology to obtain the motion sequence . The first step is to write down the motion sequence . So , we would have A + , A - , B + , B - . The second step is to separate the movements that are performed simultaneously into steps . In the case

9:49of this motion sequence , we do not have simultaneous movements , since first cylinder A extends , then cylinder A returns , then cylinder B extends , and finally cylinder B returns . Each movement is unique . So , they would remain separated in this way . This would be the first step , this would be

10:10the second step , this would be the third step , and this would be the fourth step . Step three of the methodology is to write the condition that must be met to perform each step at the bottom of the sequence . And let's remember that conditions are expressed in terms of push buttons or

10:32limit switches . And the fourth step is to write at the top of the movement sequence the element that must be activated to generate the step . By elements , we refer to solenoids and relays . And we must keep in mind that one relay is used for each step of the sequence . So , since we have four steps

10:55here , it means that to carry out this movement sequence , we will require four relays . We are going to apply steps three and four simultaneously . We have that to perform the first movement , a condition must be met , which is

11:16pressing the start button . To generate this A + movement , we have to activate an element , which would be a relay . And since it is the first relay we are going to introduce in this circuit , we will call it R1 . This relay should

11:38activate one of these four solenoids to generate that A + movement . And we can see that , to generate A + , solenoid S1 should be activated , since , by activating this solenoid , this position is switched , allowing pressurized air to pass from port one to port four ,

11:59continuing through this line to fill this chamber and produce the extension , while this other chamber is evacuated to exhaust 3 . So , we would have that to produce A + , we have to energize solenoid S1 , which would be done via relay R1 . With this , we would have the

12:22extension movement of cylinder A. How do we know that the A + movement has finished ? We would know because cylinder A would hit the limit switch FCA2 . So , that would be the condition to move from this first step to the second step . It would be that cylinder

12:45A hits the limit switch FCA2 . To produce this second step , we will require a second relay , which we will call relay R2 . To produce A - with this relay R2 , we must energize one of these four solenoids . The solenoid in charge

13:10of producing the retraction movement of cylinder A would be solenoid S2 , since , by switching solenoid S2 , we would have this valve position in which pressurized air would pass from port one to port two to continue through this line and fill this chamber , producing the retraction , while the air

13:31trapped in this other chamber would escape through this line in connection with port . four to exhaust 5 . How do we know that the A - movement has finished ? We would know because cylinder A would return completely and hit the limit switch FCA1 . So , FCA1 would be the

13:55condition to move from the second step to the third step . To generate this third step , we have to activate a third relay that we will call R3 . And with this relay , we will generate the B + movement ; for which we would have to energize solenoid S3 , since , by

14:15energizing this solenoid , this position is switched , which allows air to pass from port one to port four , continuing along this line to fill this chamber , causing the cylinder to extend , while the air trapped in this other chamber is discharged into the atmosphere via the connection from port 2 to exhaust 3

14:35. How do we know that this B + movement has finished ? Well , it would be because cylinder B touches the limit switch FCB2 , and with that , we would have the transition from the third step to the fourth step . For this fourth step , we

14:56are going to use a fourth relay that we will call R4 . to produce B - with relay R4 . we would have to energize solenoid S4 . Since by energizing this solenoid , we switch this right position of the valve , in which the pressurized air passes from port one to port two . It

15:19passes through this line , fills this chamber , produces the retraction , and this other chamber of the cylinder is discharged into the atmosphere via the connection from port four to exhaust 5 . So , we would have relay R4 activating solenoid S4 . And how do we know the movement sequence ends ? How do we know

15:40this B - movement ends ? We would know because the cylinder , upon fully returning , would touch the limit switch FCB1 . Up to this point , we would have already applied steps three and four . In the lower part of the movement sequence , we would have the conditions

16:02that must be met to perform each step , and in the upper part , we would have the elements that must be activated to generate each step , the relays and solenoids . We only need to apply step five , which is to install the general structure for each step of the sequence

16:23and assign the names of the elements . Since we have four steps , it means that for each step we require a general structure . So , we would have four general structures . On the left side , we would have the 24V line , and on the

16:45right side , the ground or 0V line . Having the four general structures , we are going to start naming the different elements . We start with the relays . This would be the relay coil that allows me to generate the first step , which would be relay R1 . Here we would

17:09have the relay coil associated with the second general structure , which is associated with the second step . So this coil would be for relay R2 . Continuing in this way , we would have this as the coil for relay R3 for the third step , and this would be the coil

17:31for relay R4 for the fourth step . As we saw previously , these two normally open contacts are associated with the current relay . So , these two normally open contacts would be contacts of

17:51relay R1 . Likewise , in that second general structure , these two normally open contacts would be for the relay of this current step , that is , they would be contacts of relay R2 . These two normally open contacts would be contacts of relay R3 and these two normally open contacts would be from

18:14relay R4 . Now we are going to name the different solenoids . We have that this relay R1 , according to the methodology we apply here , is in charge of activating solenoid S1 . So , this solenoid of the first general structure would be solenoid S1 . Relay R2 is in

18:39charge of activating solenoid S2 . So this solenoid of the second structure would be S2 . Relay R3 is in charge of activating solenoid S3 . So , this solenoid that we find in the third general structure would be S3 . And

19:00finally , we have that R4 is in charge of activating S4 . So this solenoid of the fourth general structure would be S4 . Now we are going to assign names to the normally open contacts that we find in the first line of each of the general structures . This normally open

19:24contact can be one of two things . It could be from the push button that starts the sequence or it could be a normally open contact from the relay of the previous step . Whenever we are working in the first general structure , that normally open contact would be

19:46from the start button . And in the other general structures , different from the general structure associated with the first step , they would be normally open contacts of the relay from the previous step . So , the symbol would change , it would no longer be this symbol of a normally open contact , but this symbol

20:08of a normally open relay contact . And since it is from the previous step and here we are in the second step which is associated with R2 , then this normally open contact would be of R1 . Here we would then have a normally open contact from the previous step which would be R2 . And here we would have a normally

20:29open contact from the previous step which would be R3 . Now we are going to continue naming the second normally open contact that we find in the first line of each of the general structures . These normally open contacts will be associated with the limit switch that

20:51allows the condition to be satisfied in order to perform each of those steps . Here , I like to always start with the second general structure . So we have that in order to generate the second step , which is A - , a condition must be met , which is that the limit switch

21:11FCA2 must have been triggered . So this normally open contact would be for FCA2 . To be able to generate the third step , which is B + , we have to meet a condition , which is that the limit switch FCA1 must have been triggered . So , this normally open contact would be

21:32from FCA1 . To generate the fourth step , B minus , we must meet a condition : the limit switch FCB2 must have been triggered . So , this normally open contact would be from FCB2 , and to finish the movement sequence , the FCB1

21:53contact must be pressed . So , this normally open contact in the first general structure would be this last one , FCB1 . With this , we only need to name the normally closed contacts found in each of the general structures .

22:17Remember that these normally closed contacts are associated with the relay of the following step . So , this first general structure is for the first step , that is , the step associated with R1 , and the next step is associated with R2 . Therefore , this normally closed

22:37contact would be from the next relay , R2 . This normally closed contact would be for the next step , that is , for R3 . This normally closed contact would be for the next step , that is , for R4 . And this last normally closed contact would be for the next step . Since we don't

23:01have an R5 step here , but rather the sequence repeats , it would be a normally closed contact of R1 . To finish , we would have to join the different connections of the general structures so they are all powered at 24V and connected to ground . And with

23:23this , we would have the electrical circuit that allows us to perform the movement sequence A + , A - , B + , B - using the step-by-step methodology . In the step-by-step method , you can have steps that involve the simultaneous movement of two or more cylinders . Or we can

23:44also have steps that involve meeting two or more conditions . And for these cases , the general structure we reviewed earlier is modified . First , let's review how the general structure would be modified when we want to execute simultaneous movement of two or more cylinders . In this case , we have

24:08to add one of these lines to the previous general structure for each additional cylinder . These first three lines correspond to the general structure seen previously . We have the two normally open contacts in series installed in parallel with the second line , where we find the relay's

24:29normally open contact . Continuing with that parallel , we had a normally closed contact and then the relay coil of the current step . And in the third line , to trigger a cylinder's movement , we had a normally open contact of the current step's relay that energized the valve

24:52solenoid causing the cylinder movement . So , if we have the simultaneous movement of two cylinders in one step , we would need to have two of these lines . So , this other line would be added , in which we have a normally open contact in series with the valve solenoid that causes that cylinder's

25:13movement . And for every additional simultaneous movement , we would add one of these lines . Secondly , we have the modification of the general structure when two or more activation conditions must be added , that is , two or more limit switches . In this case , the

25:38modification is made to the first line of the general structure . We have the usual two normally open contacts , and a normally open contact is added for each additional condition or each additional limit switch that must be activated to trigger the sequence step . To

26:02understand this better , let's do an example . In this example , we want to execute the motion sequence A + , B + , A - B - simultaneously when a start button is pressed . Here we have the pneumatic

26:22circuit for which we want to perform the motion sequence , and we find two double-acting cylinders , each controlled by a five-way , two-position directional valve . We see that the two valves are connected to the same pressurized air source . This would be cylinder A. This would be cylinder B.

26:43We can see that both cylinders have limit switches at the beginning and end of their travel . And we have that each valve has two solenoids , S1 and S2 for the cylinder A valve and S3 and S4 for the cylinder B valve . With this movement sequence , we want cylinder A

27:05to extend first , then cylinder B to extend , and then both cylinders to retract simultaneously . Let's apply the methodology steps . First , we have to write the motion sequence . We would have A + , B + , A - B - , separating the

27:25steps performed simultaneously . We would have a first step that would be A + , a second step that would be B + , and a third step that would be the simultaneous retraction movement of the two cylinders . A - B - . We are going to execute steps 3 and 4 simultaneously .

27:48In step 3 , we write at the bottom of the sequence the condition that must be met to perform the step in terms of buttons or limit switches . And in step 4 , we write at the top of the motion sequence the element that must be activated to generate the step , keeping in mind that those elements would be

28:07solenoids and relays , and that one relay must be used for each step of the sequence . The condition that must be met to generate the A + movement is that the start button is pressed . To be able to produce this first step , we will need a relay . Since it is the

28:27first relay , we will call it R1 . And with R1 , we are going to activate solenoid S1 . By energizing this solenoid , this position switches , allowing pressurized air to pass from port one to port four , continue along this line , fill this cylinder chamber , produce the extension , and have this

28:48other chamber exhausted to the atmosphere by connecting port 2 to exhaust 3 . To know that this A plus movement finished , a condition must be met , which is that cylinder A has touched limit switch FCA2 . So , that is the condition that allows us to make

29:09the transition from the first step to the second step . To be able to execute this second step , we will require a second relay called R2 . And with this relay R2 , we are going to activate solenoid S3 . Because by energizing this solenoid , this position switches . The

29:30pressurized air can pass from port one to port 4 , filling this cylinder chamber and producing the extension movement of cylinder B , while this other chamber is discharged to the atmosphere by connecting port 2 to exhaust 3 . To be able to know that this B plus movement is finished , we would

29:52have to meet a condition , which is that cylinder B has touched limit switch FCB2 . So , that will be the transition from step two to step three . To be able to execute this step three , we will require a relay . Although we have the movement of two cylinders , we only

30:14require one relay , since step four of the method tells us that one relay is used for each step of the sequence . It does not matter if we have a single cylinder movement or simultaneous movement of several cylinders . So , this simultaneous A-B movement only requires one relay , and as it is the third relay

30:36, it would be R3 . With this relay , we are going to activate the solenoids that allow me to do A - and B - . To produce A - , we would have to energize solenoid S2 . So that this position switches and pressurized air can flow from port one to port two to fill this

30:59chamber , produce the retraction , and have this other chamber discharged to the atmosphere by connecting port 4 to exhaust 5 . And to produce B - , we would have to energize solenoid S4 , which would allow switching this position in which pressurized air can pass from port one to port 2 to fill this chamber

31:19, produce the retraction , and have this other chamber discharged to the atmosphere by connecting port 4 to exhaust 5 . So R3 will be in charge of energizing two solenoids , S2 and S4 . To know that the movement sequence is

31:40finished , we must meet two conditions : both cylinder A and cylinder B must be fully retracted , meaning these two cylinders must touch the limit switches FCA1 and FCB1 . So , we would have two conditions for completing the sequence : FCA1 and FCB1 . With this in place , we

32:05can move to the fifth step , which is installing the general structure for each step and assigning the component names . Since we have three steps , it means we require three general structures . Here we have the first structure , second structure , and third

32:26structure . Here on the left side , we have the 24V power supply , and on the right side , we have the ground connection . We are going to start naming the different elements that we have in these general structures . We begin with the relays . In the first general structure , we have to activate

32:46relay R1 . So , this would be the coil for relay R1 . In the second general structure corresponding to the second step , we have to activate relay R2 . So , this would be the coil for relay R2 . And in the third general structure corresponding to the third step , we have to activate relay R3 . So , this

33:07would be the coil for relay R3 . These two normally open contacts that we find in the first structure would belong to relay R1 . These two contacts would be for relay R2 , and these three contacts would be for relay R3 . Why three

33:29contacts ? Because remember that since we have simultaneous movement of two cylinders here , we would have to add a line with a normally open contact and the valve solenoid to execute that additional movement . So , compared to the two structures we had before , a

33:49fourth line with those two elements is added . Now let's name the solenoids . With the first general structure , we have to activate AS1 . With the second general structure , we have to activate S3 . And with the third general

34:10structure , we have to activate S2 and S4 . So , this line would activate S2 , and this line would activate S4 . Let's continue with the normally open contacts found on the first line of each of the general structures . In the

34:30first , this normally open contact would be for the start button . In the second line , we replace that normally open contact with a normally open contact from a relay of the previous step . So , here we would have to place a normally open contact from R1 . And the same here

34:53in the third general structure , it would be a normally open contact from the previous step , which was R2 . Now we continue with the second normally open contacts of each of the general structures . With these , I always like to start with the second line , since

35:14this normally open contact would be from the limit switch that allows the transition from step one to step two ; that is , it would be a normally open contact of FCA2 . The next normally open contact would be the one that allows the transition from step two to step

35:34three ; that is , it would be a normally open contact of the limit switch FCB2 . And finally , we go back to the first line . Here we would need to place normally open contacts for this last condition that allows finishing the motion sequence . And since we have two

35:55conditions , two normally open contacts must be added . The first would be from FCA1 and the second from FCB1 . This is the second modification we saw previously . Modification when we have two or more conditions to meet to execute a step . Lastly , we have to name

36:15the normally closed contacts for each general structure . Remember that these contacts are from the next relay , from the relay of the following step . Since this is the first step , this normally closed contact would be from the next one , that is , R2 . This contact would be

36:38from the next step , that is , R3 . And this would be the next step , but since we have an R4 , it would be from the first one ; it would be a normally closed contact of R1 . To finish , we would need to connect all the lines together , so that all the general

36:58structures are powered at 24V and connected to ground . With that , we would have the electrical circuit that allows us to execute the A + B + A - B - motion sequence . With this , we have finished this video on the step-by-step methodology for electropneumatic circuits . If this video was helpful , I

37:20invite you to subscribe to the channel and like this video . In upcoming videos , we will be performing different motion sequences using the step-by-step method and simulating them in FluidSIM .

Recently added transcripts

Browse the whole transcript library Browse all English transcripts

This transcript was generated from the captions YouTube publishes for this video. Get the transcript of any YouTube video atfreeyoutubetranscribe.com, free, unlimited, no sign-up.