Free YouTube Transcribe

Video transcript

What It Costs To Make $19,000/Month💸

Mike and Bo · 2,159 words · 10 min read

Want to search this transcript, jump the video from any line, or download it as TXT, SRT, or VTT?

Open in the transcript tool

Full transcript

0:00There is no money coming out of our

0:01pocket. Now, I was here about 3 hours

0:03ago, but it looked like this. When this

0:05is [music] stabilized, we'll have 3x

0:06this property, at least. You can tell

0:08that the structure of this thing is

0:09sound. I mean, it Oh, it's not screwed

0:11together yet.

0:13>> [laughter]

0:14>> All right, ignore all that. I just did

0:15that.

0:16>> no better return on investment than

0:17converting a light industrial building

0:19>> [music]

0:19>> into a climate-controlled storage.

0:21>> What's happening, guys? We're here to

0:23show you exactly every dollar it's taken

0:25to convert this 20,000 square foot light

0:28industrial building into

0:29climate-controlled storage.

0:30>> And these are the facts because we've

0:31already done this one time before on the

0:33same property. So, this is proof.

0:35>> We have 20,000 [music] square foot out

0:37front. We converted it about 3 years

0:38ago. Now, we're taking this building

0:39that Mike used to rent for $5,500 a

0:42month, and we're going [music] to turn

0:43it into climate-controlled storage. So,

0:44here's the exact breakdown cost of

0:47exactly what it takes to convert 20,000

0:49square foot.

0:50>> Just to give you some of the highlights,

0:51the build-out, the materials, and the

0:52labor is just under 200,000 for 20,000

0:55square foot. Site plan was about

0:57$10,000. Cameras, [music] keypads, fire

0:59electrical system, all those total for

1:01another $25,000. The electrical on this

1:04building was about $76,000, and the

1:06reason why in this building it was

1:08already insulated, but we didn't have

1:09HVAC on it. So, to get all the

1:11electrical run throughout the building

1:12for the HVAC and the lighting was about

1:1476,000. [music]

1:15>> The HVAC system was around 76,000. Then,

1:18you're talking about interior doors that

1:20for entry, only a couple of those that

1:22are nice glass doors. Some of the other

1:24odds and ends, we already had a fire

1:25suppression system in here, but we just

1:27had to check through that, get it all

1:28updated, actually hang some fire

1:30extinguishers in the building. That's

1:31another 2,500. The carpentry work on the

1:34inside, the cabinetry for [music] the

1:36alarm system, and some of the camera

1:37system and stuff was about 12,500.

1:40>> of miscellaneous things here, signage

1:42about 2,500, getting our plans printed,

1:45500 bucks. But, everything totals out

1:47that you can see for the 20,000 square

1:48foot building was just under $500,000.

1:52Now, like I said, the other 20,000

1:53square foot building that we have was a

1:57less because we didn't have to do the

1:58electrical and the HVAC system in the

2:00building. So, you can tell we can give

2:02you all the details of exactly the

2:04breakdown why each one of these cost

2:06what they did, and there's no better

2:07return on investment than converting a

2:09light industrial building into [music] a

2:11climate-controlled storage.

2:12>> All right, check it out. When you're

2:13watching these videos, we know that you

2:14guys have questions that aren't

2:15answered. Might be about business, might

2:17be about real estate. Well, guess what?

2:18We can answer all those questions that

2:20aren't getting answered in this video.

2:21So, shoot us a text at 928-605-4335

2:25cuz there's questions that need to be

2:26answered, and this dude and I will

2:27answer those questions for you.

2:29928-605-4335

2:31shoot us a text.

2:32>> And the other thing about it, not only

2:34that it's a great thing to do and it

2:35cash flows, is they're easy to exit.

2:38Everybody loves storage, and everyone

2:41really loves climate-controlled storage.

2:43So, we love it, too.

2:44>> Yep.

2:44>> We're always trying to buy it, and guess

2:45what? We get phone calls every single

2:47day cuz of all the storage complexes we

2:48own, so it's an easy exit.

2:50>> So, like to convert multi-family or

2:52something like [music] that, it's much

2:53tougher to do something like that. To

2:55build it ground up, it's so hard to do.

2:57Uh the Verbos, those businesses are

2:59seasonal. This business is very turnkey.

3:01Once you do your preliminary work, all

3:03the site plans and the engineering,

3:05boom, the build-out of this thing is

3:06going to be done in probably about 2 to

3:073 [music] weeks.

3:08>> It's crazy how fast it goes.

3:10>> Yep. Then we'll get our certificate of

3:11occupancy. Fill-up time is only going to

3:12be probably 8 months to 10 months,

3:15maybe. We already know what the

3:16projected volume's going to be because

3:18of our other 20,000 sq ft up the road.

3:20>> Some of the key things that you want to

3:21look at if you do have a building or you

3:23find a building and you want to convert

3:24it, what are some of the things, Mike?

3:25>> What do you got to analyze the market?

3:26We always say there's nothing that works

3:29if there's not a demand, and you can't

3:30create demand. So, the first thing is

3:32have an analysis done to make sure you

3:33have a demand for climate-controlled

3:35[music] storage. That's number one.

3:36>> Yeah, so once you have that demand, I

3:38would say some key things to look at in

3:40the building. Is it insulated? This

3:41building was already insulated. Does it

3:43have HVAC? This building didn't have

3:44HVAC on it. What is the total square

3:46footage of the building? Cuz sometimes

3:48when it's a smaller footprint, it

3:49doesn't necessarily work because you

3:51only actually get about 70% so this

3:53one's 20,000 square foot the rentable

3:56space because of the hallways in this

3:57building is only going to be about

3:5914,000. So you lose about 30% so you're

4:01going to leave lose probably about 6,000

4:03square feet to just hallways and stuff

4:05in the building. But when you run the

4:06numbers and you know that you can get

4:07about a dollar a square foot to a dollar

4:09fifty a square foot for climate

4:10controlled then you know it's going to

4:12be 14,000 square foot so at the very

4:14bottom of the market for climate control

4:16[music] you're going to bring in 14,000

4:18at the top you're going to probably

4:20bring in around $20,000 or more. The

4:22other thing to be careful with is making

4:24sure with your county fire department

4:26city state whatever you got [music] fire

4:27suppression. We got fortunate because

4:29this fire suppression system like Bo

4:30said was already here and we just had

4:32very small upgrades. [music] If we had

4:34to add this I'm not sure if we would do

4:36this project with this size. If it was

4:3840,000 square feet and the demand

4:39[music] was there yes but 100,000 I'm

4:41not sure we didn't talk about it cuz it

4:42was already here. But that's something

4:43you'd have definitely have to put in

4:44your math problem.

4:45>> Yeah.

4:46>> We currently own this building so we

4:47ended up just going to get into

4:49construction loan and we can show you

4:51the breakdown of exactly what it took

4:52[music] to put that budget together to

4:54go get that bank loan. So like with this

4:56there is no money coming out of our

4:58pocket. We've already got a bank loan on

4:59this property currently because of the

5:01value increase of this property once we

5:03change it to climate control the bank

5:04has given us the full $500,000 to build

5:07it out. So what's going to happen is

5:08with this loan you're going to have a

5:09draw schedule you go and get $50,000

5:11towards the metal you get $50,000

5:13towards the electrical and $50,000

5:15towards the climate control. And then

5:16you pay those contractors so there's no

5:18money out of your pocket during the time

5:19of the construction loan either. They

5:21are going to fund this whole thing all

5:22the way through. They'll do small

5:23inspections as it's being done to make

5:25sure it's being done properly but other

5:26than that there's no money out of our

5:27pocket just a little bit of time to put

5:29this thing together.

5:30>> [music]

5:30>> And when this is stabilized we'll have

5:31three x this property at least.

5:33>> Yeah.

5:34>> The difference of climate controlled

5:36storage versus [music] storage that you

5:37see on the side of the road that has the

5:39garage doors just like these are going

5:40to have there's no structure to this.

5:42This doesn't have to hold wind there's

5:43no load bearing weight roof on here

5:45there's just chicken wire. So look at

5:47the steel here. It's just nothing

5:50compared to the steel that it takes

5:52>> [music]

5:52>> to build storage outside. This is the

5:55type of steel you would use, this type

5:56of steel, but it's already done. So, all

5:58the structure is here. This is just

6:01snapped together really thin metal,

6:04right, Bo? There's How many screws are

6:05holding this up?

6:06>> two.

6:07>> One screw there and one screw there.

6:09It's looks like a joke, but when it's

6:11all tied together, it's strong as hell.

6:13>> tied together, then it's much stronger.

6:14A lot of people have that question

6:15whenever they're renting one of these

6:16units. But, once you build this out like

6:18some of these units that are over here

6:19to our left, you can tell that the

6:21structure of this thing is sound. I

6:22mean, it

6:24it Well, it's not screwed together yet.

6:25>> [laughter]

6:27>> All right, ignore that. I just did that.

6:28But, honestly, like the corner pieces

6:30are all diamond plate, so there is not a

6:32lot to these things. I mean, all of this

6:34is just sheet metal, you know,

6:36corrugated sheet metal. The heaviest

6:37thing here is the doors, and even with

6:39those, they go with like a lightweight

6:40door. But, the thing about it is you've

6:42got security cameras everywhere. I don't

6:44know how many times we've got called

6:45about theft in our [music] storage

6:47facilities. I don't believe we've ever

6:48got called about theft in one of our

6:49climate control storage.

6:50>> Or someone living in. Or someone doing

6:52something they shouldn't be doing.

6:53>> And they're a little bit more expensive,

6:54so you get a little bit better clientele

6:56in these than what you would in like a

6:57regular self-storage unit.

6:59>> These units right here, they were not

7:01built out this morning. I was here about

7:023 hours ago, and this is double-sided

7:05here, but it looked like this on this

7:07side this morning whenever I walked into

7:09it. And there was [music] probably four

7:10guys working on it for probably 3 or 4

7:12hours, and boom, that's built out. So,

7:14you figure [music] this whole area right

7:16here is probably 20% of the build-out

7:18right here, just this whole one side,

7:20and they did it in about 4 hours.

7:21>> Today it's Monday, it's uh 12:30 in the

7:23afternoon, and they started Thursday on

7:25a half day, and this is how far they

7:27got, so.

7:28>> Obviously, one of the biggest expenses

7:29is going to be HVAC and then your

7:31electrical and insulation. So, this

7:33building was already insulated. The

7:35electrical was run to the building, but

7:36there was no HVAC system, so it cost

7:38about 75,000 to run all the electrical

7:40to all the HVAC and all the lighting,

7:42and cameras, and stuff around the 20,000

7:44sq ft building. But, then the HVAC cost

7:4675,000. So, if you didn't have that,

7:48like on last building that we did, it's

7:4920,000 sq ft, and it cost us about 350

7:52grand to do that one. And so, we saved

7:54with the electrical, and we saved with

7:55the HVAC.

7:56>> And one thing, when you go to do your

7:57calculations, always remember that it

7:59takes [music] about 30% of the building,

8:01sometimes 25, just depends, for the

8:03hallways and all the exits and

8:05entrances. [music] So, in 20,000 sq ft,

8:07you don't use your math and start

8:08figuring out 20,000 sq ft of of income.

8:11That's not how it works. You're going to

8:12lose 30% [music] to just walkways, and

8:14obviously you don't make any money off

8:15that.

8:16>> at 70% of whatever the total square

8:17footage is. So, on this one, we'll have

8:19rentable 14,000 sq ft. We're going to

8:21rent for over a dollar a square foot. We

8:23might rent it for a dollar a square foot

8:24whenever they're first coming in to fill

8:25this thing up. But, this building should

8:27probably actually bring in about 18 to

8:2919,000 dollars a month on an average.

8:31>> So, if you have any questions on how to

8:32take a light industrial building and

8:34turn it into climate-controlled storage,

8:35all you got to do is reach out to us.

8:36Shoot us a text at 928-605-4335.

8:40[music] Ask us any question of what it

8:42takes to do it, right, Mike?

8:43>> Absolutely. We love doing this, too, cuz

8:45there's a lot of buildings out there

8:45that this can be done in. We just,

8:47[music] you need to make sure you check

8:48the demand for it.

8:49>> Yep. So, reach out to us again. Text us

8:50at 928-605-4335.

8:53Ask us any question [music]

More from Mike and Bo

Recently added transcripts

Browse the whole transcript library

This transcript was generated from the captions YouTube publishes for this video. Get the transcript of any YouTube video atfreeyoutubetranscribe.com, free, unlimited, no sign-up.