Free YouTube Transcribe

Video transcript

25 September 2026

Nuha Mohammed · 621 words · 3 min read

Want to search this transcript, jump the video from any line, or download it as TXT, SRT, or VTT?

Open in the transcript tool

Full transcript

0:00Hello, my name is Khadija Al-Habshi and

0:03my question is question one.

0:05Uh

0:06which about the kinetic uh the Kent uh

0:10and cyber shielding

0:11leopard. Basically, this question focus

0:14on how we can keep the supply chain

0:18operating during a major cyber attack.

0:21In the scenario, 40% of the automated

0:24port and intermediate equipment is

0:27affected and the GPS and AIS tracking

0:31system are no longer reliable.

0:36So, in this question, I need to cover

0:38three main things. First, how we can

0:41secure the system and track shipments

0:44without depending on GPS. Second, I need

0:48to calculate how much corridor can

0:51actually handle after the turnaround

0:54time increase from 40 to 58 hour. And

0:58finally, I need to explain how

1:00manufacturing

1:02uh real this

1:04uh dispatch and warehousing can be

1:06adjust to prevent condition and uh

1:09terminal gridlocks.

1:12So, overall, my question is about

1:14keeping the logistics flow secure and

1:18operating even under these uh degraded

1:21conditions. Thank you.

1:23>> For question two, I will talk about how

1:25we manage the energy during the crisis.

1:27The corridor's normal capacity is 14,000

1:30MW,

1:31but during the crisis, it drops to 9,800

1:35MW.

1:36So, we prioritize the most critical

1:38operations. Port and rail gets 100%

1:43pharmaceutical cold chain gets 95%

1:46LNG calling gets 85% automotive and

1:50green technology gets 70% and

1:53petrochemical and fertilizer industries

1:55gets 50%.

1:57To strengthen the system, we also add a

1:591,200 MW from solar, waste heat

2:03recovery, and cogeneration. This gives

2:06us enough energy to maintain

2:09uh critical operations and a 1,285

2:13MW reserve margin.

2:16So, overall, our approach is to

2:18prioritize essential operations, reduce

2:21non-critical energy use, and add

2:23renewable and distributed energy

2:26sources.

2:26>> cover question three and four, data and

2:29contracts.

2:30Question three, uh Western companies

2:33bring 55% of the cargo, but

2:36uh but uh Asian companies own 60% of the

2:39equipment. Our fix, we keep two record

2:43the equipment work as a normal. A

2:45second, secure record just prove

2:49uh container-based customers without

2:52showing which equipment was used. So,

2:54Western companies get their proof and

2:56keep uh our partners.

2:59It's also fast, no delay at all.

3:01Question four, our two biggest risk are

3:04the power company and the insurance

3:07company, so we made clear agreements

3:09with the penalties. Power company must

3:12give us 3,000 MW minimum or be uh or pay

3:16a fine.

3:17Insurance must approve shipment within 2

3:20hours or lose the right to charge uh

3:23extra fee.

3:24Uh we also uh we also cut uh their uh

3:28fee cut from 400%

3:31to 150%. So, question three keep uh our

3:35data safe without losing partners, and

3:37question four turns promise into real

3:40enforced proof.

3:42>> Hi, I'm Safiya, and today I will discuss

3:44question five, which focuses on our 2030

3:47post-crisis capital round map.

3:51And our goal is to transform the

3:53temporary solution introduced during the

3:552026 crisis into permanent investment

3:59that strengthen the corridor.

4:01In 2027, we will focus on cybersecurity

4:04by permanently implementing the

4:07zero-trust system and secure data

4:09networks across critical terminals and

4:13and rail hubs.

4:15In 2028, we will focus on energy

4:18resilience by expanding our 1,200

4:22MW distributed energy system,

4:25including solar and battery storage,

4:28waste heat recovery, and cogeneration.

4:31In 2029, we will invest auto autonomous

4:36cargo rail, automated dry ports, and

4:40faster custom processing.

4:42Our target is to is to exceed the

4:45original capacity of 10,000 TEU per day

4:49and reduce uh turnaround time toward the

4:53normal 14 hours.

4:55Finally, by 2030, we will integrate

4:58these investments with the green

5:01hydrogen infrastructure and advanced

5:04manufacturing.

5:05So, by following this random

5:08uh

5:09this uh road map, the corridor will move

5:12from being an emergency alternative

5:15route to a secure, resilient, automated,

5:19and competitive freight corridor.

5:22Thank you.

Recently added transcripts

Browse the whole transcript library

This transcript was generated from the captions YouTube publishes for this video. Get the transcript of any YouTube video atfreeyoutubetranscribe.com, free, unlimited, no sign-up.